| 1. MATERIAL SOURCE: |
| |
FOR
ENSURING ALL MATERIALS ARE STABLE & BEST, WE HAVE TWO SOURCES
TO GET THE RELIABILE AND TRACEABLE MATERIALS. 1.1 DIRECT
SOURCES:
DOW DUPONT ----- VITON
(FKM), VAMAC , NEOPRENE
DAIKIN ---------------- DAI-EL
(FKM)
3M ---------------------- AFLAS
BAYER ---------------- THERBAN (HNBR)
ZEON ------------------ ZETPOL
(HNBR)
WACKER ------------- ELASTOSIL
( SILICONE)
GE TOSHIBA -------- SILICONE
1.2 FROM THE MATERIAL LABORATORY:
NITRILE, X-NBR, EPDM, URETHANE ¡K ETC. AND ALL KINDS OF CUSTOM SPECIFICATIONS. |
| 2. MATERIAL COMPOUNDING: |
| |
WE USE DIFFERENT MIX ROLLERS
TO COMPOUND DIFFERENT MATERIALS & COLOR TO REDUCE MATERIAL CONTAMINATION.
STRICT PRESCRIPTION AND COMPOUNDING PROCESS CONTROL.
|
 |
| 3. MATERIAL COOLING TABLE: |
| |
USE DIFFERENT TABLES FOR DIFERENT
MATERIALS TO KEEP THE MATERIAL OUT OF DUST AND COOL DOWN AFTER COMPOUNDING. |
 |
| 4. MATERIAL CUTTING: |
| |
 |
USE DIFFERENT CUTTING MACHINES TO
CUT DIFFERENT MATERIALS TO REDUCE THE MATERIAL CONTAMINATION. |
|
| 5. PRODUCTION: |
| |
STRICT PRODUCTION PROCEDURE
FULL CURING TIME
STRICT MATERIAL FILLED
TO ENSURING THE QUALITY PERFORMANCE & MIN. PARTING LINE.
|
 |
| 6. IN PROCESS INSPECTION : |
| |
6.1 |
IN PROCESS INSPECTION BY PRODUCTION
OPERATERS, TO PREVENT THE DEFECTIVE ITEMS PASS TO NEXT PHASE. |
 |
| 6.2 |
IN PROCESS INSPECT THE PRODUCT
OF EACH CAVITY AFTER POST CURED, TO ENSURE MEETING THE REQUEST OF
DIMENSIONS, SURFACE & PERFORMANCE. AND TRACE THE ORIGIN OF THE
DEFECT. |
| 7. POST CURE: |
| |
 |
FULL TEMPERATURE AND
TIME TO POST CURE, TO ENSURE THE QUALITY PERFORMANCE. |
|
| 8.FINAL INSPECTION ¡V1: |
| |
100% VISION
INSPECTION BY EMPLOYEE.
|
 |
| 9.FINAL INSPECTION ¡V2: |
| |
COOPERATE WITH
INSPECTION COMPANY, USE THE 100% VISION INSPECTION MACHINE TO ENSURE
EACH PART IS AS WELL AS THE CUSTOMER REQUEST. |
| |
|
| |